This patch sets the max_cache_size value required to tune up
scheduler in SMP systems. Otherwise, the calculated
migration_cost is too high and task scheduling may lock up.
Signed-off-by: Krzysztof Helt <krzysztof.h1@wp.pl>
Signed-off-by: David S. Miller <davem@davemloft.net>
"clock-frequency", 0);
cpu_data(id).prom_node = cpu_node;
cpu_data(id).mid = cpu_get_hwmid(cpu_node);
"clock-frequency", 0);
cpu_data(id).prom_node = cpu_node;
cpu_data(id).mid = cpu_get_hwmid(cpu_node);
+
+ /* this is required to tune the scheduler correctly */
+ /* is it possible to have CPUs with different cache sizes? */
+ if (id == boot_cpu_id) {
+ int cache_line,cache_nlines;
+ cache_line = 0x20;
+ cache_line = prom_getintdefault(cpu_node, "ecache-line-size", cache_line);
+ cache_nlines = 0x8000;
+ cache_nlines = prom_getintdefault(cpu_node, "ecache-nlines", cache_nlines);
+ max_cache_size = cache_line * cache_nlines;
+ }
if (cpu_data(id).mid < 0)
panic("No MID found for CPU%d at node 0x%08d", id, cpu_node);
}
if (cpu_data(id).mid < 0)
panic("No MID found for CPU%d at node 0x%08d", id, cpu_node);
}